Latest Trending
Last Updated, Feb 14, 2024, 7:36 PM
Peabody council allocates $500,000 for Greenway extension


The Peabody City Council approved the allocation of $500,000 in Community Preservation funds for the completion of the 75% design stage of the Independence Greenway extension.

The allocation, voted on by the Community Preservation Committee, will go toward the Route 1/Lowell Street connection segment of the bike path, Finance Director Mike Gingras told councilors during a meeting of the Finance Committee. The extension project will connect disparate segments of the path, including by constructing a pedestrian bridge over Route 1.

Councilors lauded the project, with Ward 2 Councilor Peter McGinn, who chairs the Finance Committee, calling it “transformational” for the city.

“Major expansion of the bikeway is something I’m personally very excited about,” he added.

While the city will not pay for the construction costs of the project, it is on the hook for the cost of right-of-way acquisitions along the path of the extension. The $14 million project is funded by the Federal Highway Administration and the Massachusetts Department of Transportation, with the FHA paying 80% of the total, and MassDOT paying the other 20%.

The existing greenway is a 6.1-mile multi-use bike path consisting of 4.6 miles of separated multi-use paths and 1.5 miles of on-street paths. The project discussed Tuesday would replace the on-street path with 1.25 miles of separated multi-use paths, including a pair of bridges over Route 1 and Proctor Brook.

The path comprises three main segments: the first from Lt. Ross Park to Lowell Street, the second from the Route 1 ramp to Bourbon Street, and the final from Lowell Street to Peabody Road. The project would unite those disparate segments into one united path.

To do so, officials propose the construction of the new 1.25-mile stretch, which would vary between 10 and 12 feet in width with two-foot gravel shoulders. The project would also feature a revised lane configuration on Lowell Street, including signal-timing optimization and a pedestrian bridge over Proctor Brook, in addition to the bridge over Route 1.

As part of the Independence Greenway project, a pedestrian bridge will be built over Route 1 in Peabody.

The project would also see a number of improvements made along Lowell Street, not just the signal-timing optimization and revised lane configuration but also signalized pedestrian crosswalks and a widened traffic island.

Under current design plans for the project, Peabody would need to acquire eight permanent easements, six temporary easements, and one fee acquisition. The city is responsible for contacting affected property owners, who are entitled to an appraisal and just compensation under state law.

  • Charlie McKenna

    Charlie McKenna is a staff reporter at The Daily Item covering the towns of Saugus and Marblehead, and the City of Peabody. McKenna graduated from Emerson College in 2022 with a degree in journalism. Before joining the Item, McKenna worked on The Boston Globe’s metro desk. In his free time, McKenna can be found listening to Steely Dan.



Source link

24World Media does not take any responsibility of the information you see on this page. The content this page contains is from independent third-party content provider. If you have any concerns regarding the content, please free to write us here: contact@24worldmedia.com

Latest Post

This Lava Tube in Saudi Arabia Has Been a Human Refuge for 7,000 Years

Last Updated,Apr 17, 2024

Four Wild Ways to Save the Koala (That Just Might Work)

Last Updated,Apr 15, 2024

National Academy Asks Court to Strip Sackler Name From Endowment

Last Updated,Apr 12, 2024

Ways Industrial Copper Helps Energy Production

Last Updated,Apr 11, 2024

The Ins and Out of Industrial Conveyor Belts

Last Updated,Apr 10, 2024

She Dreams of Pink Planets and Alien Dinosaurs

Last Updated,Apr 10, 2024

Why Your Family Should Play With Your Pet Outdoors

Last Updated,Apr 9, 2024

Arkansas Braces for Flood of Tourists During Total Solar Eclipse

Last Updated,Apr 8, 2024

New England Journal of Medicine Ignored Nazi Atrocities, Historians Find

Last Updated,Apr 6, 2024

Judge Orders Timely Housing for Migrant Children Waiting at Border

Last Updated,Apr 4, 2024

Community calendar: April 4, 2024

Last Updated,Apr 4, 2024

Real Estate Transfers: April 4, 2024

Last Updated,Apr 4, 2024